Increased efficiency through prefabrication

Many construction processes can be made more effective by relocating them to the factory: Perfect working conditions prevail in the factory, the workers are not exposed to the weather and other changing influences. Work processes can therefore be carried out faster and more precisely. At the construction site, these operations are eliminated, reducing construction time. Based on these considerations, we have designed our products so that as many components as possible can be installed at the factory. Thus, VST elements can be supplied with already installed reinforcement, empty electrical piping as well as heating and sanitary piping. Openings and bridges are also cut out at the factory.